Start with the room — and how you use it
If this is your only bathroom, practical arrangements deserve attention before the work starts. Tell us who lives at home, whether another bathroom is available and whether you expect to remain at the property. We discuss those circumstances alongside the changes you want to make.
A full renovation is also a chance to reconsider the room: the shower or bath arrangement, where storage is needed and which parts of the current layout are frustrating. Bring those priorities to the site visit, even if you have not chosen the final products.
What to send with your enquiry
- Your Hammersmith address or postcode and whether the property is a house or flat.
- Whether this is your only bathroom and whether you plan to stay at home.
- The main changes you want, plus photos of the current room if available.
- Any access information or requirements already supplied by your building manager.
These details help us discuss the whole project before the written quotation is prepared. You do not need a finished design to start the conversation.
Can I remain at home during the renovation?
It can be possible, depending on the work and facilities available. We discuss the arrangements for your home before starting; the existing bathroom should not be assumed to remain usable throughout a complete renovation.
How long will the work in my home take?
Bathroom renovations typically take 2–4 weeks on site, depending on scope. Product ordering and the agreed start date are separate parts of the plan. Tell us about any important dates when making your enquiry so they can be discussed before a programme is agreed.
The full renovation, clearly described
Allow around £15,000–£25,000 as a total budget for a complete bathroom renovation, covering labour, building materials, tiles, bathroom fittings and finishes. Products you buy yourself are part of this total. This is a planning range, not a minimum spend or a fixed quotation. Room size, layout and product choices affect the cost. Tell us your budget so we can discuss what is achievable after a free site visit.
Your quotation covers the agreed scope and distinguishes the work, building materials and products we supply from purchases you make yourself. We focus on complete renovations, including compact bathrooms, rather than small repairs or fitting-only work.
Bathroom renovations typically take 2–4 weeks on site, depending on scope. Product ordering and the start date are discussed separately. We prepare the written quotation after a free site visit.
See the work, then discuss your own project
See our completed renovation projects. These are real BathWright renovations; they illustrate our work rather than a promise that your room will have the same specification, budget or programme.


